Documents for Your Development

For information on Development Applications at Sydney Metro Airports Bankstown and Camden a Development Application Guide for Applicants 2011  provides a step by step guide to the Development Application process for both Bankstown Airport Limited (BAL)
and Camden Airport Limited (CAL).

A Development Application (DA) at Sydney Metro Airports Bankstown and Camden will require the lodgement of DA Forms 1 of 3, 2 of 3 and 3 of 3 available below, along with your supporting documentation including but not limited to location plans and building layout plans.  Your Application should be lodged at Bankstown Airport Management Centre,
3 Avro Street, Bankstown Airport.

For more information and assistance, please contact our Development Department on
(02) 9796-2300 or development@bankstownairport.com.au 

BAL/CAL
Development Application Forms

Form 1 of 3 - Development Application Lodgement Checklist 2011 Form 2 of 3 - Development Application 2011Form 3 of 3 - Assessment of Environmental Effects 2011

Fees

Development Application Fees 2011

Further Information

Development Application Consultation Policy 2011Urban Design Guidelines 2009Contractor Handbook 2009 Site Safety and EnvironmentConstruction Environment Management Plan Guidance Material 2009

ABC (Airport Building Controller)
Building Application Forms

Building Applications are required by the Airport Building Controller (ABC) for any building/construction works, earthworks, demolition works, civil works, services works or change of building use (classification) on the Airport. The ABC contacts are Steve Glanville (02) 8344 3114 or steve.glanville@philipchun.com and Trevor Dartnell (02) 8344 3113 or trevor.dartnell@philipchun.com.

Complete the relevant Application from the Building Application Forms available below:
  • Application for Building Permit (for construction of any building or structure)
  • Application for Works Permit (for earthworks, civil works, electrical works or hydraulic works)
  • Application for Demolition Authorisation (for demolition of existing structures)
  • Application for Certificate of Compliance Occupancy/Use (for change of building classification, no building works)
Where it is proposed to change the building classification but there are no building works, you should contact the ABC to determine the relevant approval requirements.

Please note the following extract from advice to BAL from the Department of Infrastructure & Transport : "In the 2011 Federal Budget, the Government increased the revenue to be collected from application fees for building approvals at the leased Federal Airports".

The Government will amend the Airport (Building Control) Regulations 1996 to increase the fees listed in Schedule 1 of that Regulation. This is the first fee increase since 2002 and in most cases the first substantial increase since 1997. The increases took effect from 1 July 2011.

The schedule of increased ABC Fees is included in the "Building Application Forms and Fees 2011" below.

Building Application Forms and Fees 2011